Saltar al contenido principal

Esquema: bomba cegadora

Poco comúnEngineering
Abrir en la casa de subastas

Publicidad

Precio

Valor de mercado en Blackhand (EU)

31.249g 98s 0c
23 % por debajo del valor de mercado medio de 7 días
Compra inmediata más baja
31.249g 98s 0c
Anuncios
2
Valor de mercado medio de 7 días
40.457g 58s 34c
  • Blizzard, cada hora
  • 57 escaneos
Cómo se miden los precios
  • Esquema: bomba cegadora
  • Nivel de objeto: 1
  • Engineering
  • Precio de venta: 5s 0c
Fuentes: cae de 1 fuente y 1 receta

Fuentes

  • Cae de 1 fuente.

Botín de, 1 fuente

  • Mekgineer Thermaplugg Flash Bomb Item Level 11 Use: Causes all Beasts in a 5 yard radius to run away for 10 sec. &nbsp0,55 % de probabilidad de botín

Receta, 1 fuente

  • a Flash Bomb

La mayoría de las fuentes proceden de los datos del juego de Blizzard.

Publicidad

Mercado

Blackhand (EU)

Historial de precios

Blackhand (EU)
Mínimo
31.249g 98s 0c
Media
39.473g 67s 79c
Máximo
125.000g 0s 0c
Muestras
57
La media de 7 días necesita al menos una semana de historial; elige un periodo mayor que 1D.Mostrar la media de 7 días del precio de mercado
Historial de precios de Esquema: bomba cegadora, 1 semana, Blackhand (EU)
Hora (UTC)Mín.MediaCantidad
24 oct, 1531.250g31.250g2
24 oct, 1831.250g31.250g2
24 oct, 2131.250g31.250g2
25 oct, 031.250g31.250g2
25 oct, 331.250g31.250g2
25 oct, 631.250g31.250g2
25 oct, 931.250g31.250g2
25 oct, 1231.250g31.250g2
25 oct, 1531.250g31.250g1
25 oct, 1831.250g93.750g1
25 oct, 21125.000g125.000g1
26 oct, 0125.000g125.000g1
26 oct, 3125.000g125.000g1
26 oct, 6125.000g125.000g1
26 oct, 931.250g62.500g2
26 oct, 1231.250g31.250g2
26 oct, 1531.250g31.250g2
26 oct, 1831.250g31.250g2
26 oct, 2131.250g31.250g2
27 oct, 031.250g31.250g2
27 oct, 331.250g31.250g2
27 oct, 631.250g31.250g2
27 oct, 931.250g31.250g2
27 oct, 1231.250g31.250g2
27 oct, 1531.250g31.250g2
27 oct, 1831.250g31.250g2
27 oct, 2131.250g31.250g2
28 oct, 031.250g31.250g2
28 oct, 331.250g31.250g2
28 oct, 631.250g31.250g2
28 oct, 931.250g31.250g2
28 oct, 1231.250g31.250g2
28 oct, 1531.250g31.250g2
28 oct, 1831.250g31.250g2
28 oct, 2131.250g31.250g2
29 oct, 031.250g31.250g2
29 oct, 331.250g31.250g2
29 oct, 631.250g31.250g2
29 oct, 931.250g31.250g2
29 oct, 1231.250g31.250g2
29 oct, 1531.250g31.250g2
29 oct, 1831.250g31.250g2
29 oct, 2131.250g31.250g2
30 oct, 031.250g31.250g2
30 oct, 331.250g31.250g2
30 oct, 631.250g31.250g2
30 oct, 931.250g31.250g2
30 oct, 1231.250g31.250g2
30 oct, 1531.250g31.250g1
30 oct, 1831.250g31.250g2
30 oct, 2131.250g31.250g2
31 oct, 031.250g31.250g2
31 oct, 331.250g31.250g2
31 oct, 631.250g31.250g2
31 oct, 931.250g31.250g2
31 oct, 1231.250g31.250g2
31 oct, 1531.250g31.250g2
  • Mín.
  • Media
  • Cantidad
  • Último precio más bajo
Valor de mercado diario de Esquema: bomba cegadora
DíaValor de mercadoAnuncios
31 oct31.249g 98s 0c2
30 oct31.249g 98s 0c2
29 oct31.249g 99s 0c2
28 oct31.249g 99s 0c2
27 oct31.250g 0s 0c2
26 oct31.250g 0s 0c2
25 oct125.000g 0s 0c1
24 oct31.250g 0s 0c2

Horario de mercado: las horas más baratas y más caras de la semana, en tu hora local

Horario de mercado

Descubre cuándo Esquema: bomba cegadora suele venderse por debajo o por encima de su precio habitual, según los últimos 30 días.

La cuadrícula sigue la semana de subastas en UTC. Tu hora local (UTC+0) se muestra al lado.

Cargando horario de mercado
Más barato de lo habitualHabitualMás caro de lo habitualDatos limitados